The Camp Nou, in ruins during its remodeling

Barça will seek to take action in this regard

Wounded two workers from the Camp Nou works for a fight

Published New:23/05/2024 - 17:06h

Updated New:23/05/2024 - 17:06h

FC Barcelona has lived a very particular situation this Thursday after some workers in the remodeling works of Camp Nou starred a fight

Calendar of FC Barcelona

The System of Medical Emergencies (SEM) has presented this Thursday in the works of the Spotify Camp Nou after a fight occurred near of the midday. Like this it informed it 'EFE', signalling that it produced an altercation between several workers that found in the remodeling of the stadium of the FC Barcelona and even one of them has been transfer to a sanitary centre of the Catalan capital to be able to be attended.

Although the Mossos d'Esquadra have not practised any arrest, himself that have identified to some of the people participants in the fight, as it aims the information. Besides, by the moment desconocen the reasons that have caused the fact, although yes that results tranquilizador that do not treat of an accident of the work, which up to now has advanced almost without setbacks.

The Barça is very attentive to the situation

The sources of the Barcelona club himself that have signalled that it has initiated an investigation for averiguar the sucedido and besides ensure that they will take the necessary measures so that a similar situation do not go back to occur. The fight would have produced in the street Arístides Maillol, in front of the door of the Camp Nou, in which two groups of workers have confronted between himself.

The works continue advancing thinking in 2024 and 2026

It is worthwhile to remember that the company commissioned of the remodeling of the stadium of the Catalan club, Limark, has like aim finalise the works of the stadium before the day 24 September 2026. Any delay in this date will involve the payment of one million daily euros to the club like compensation, highlighting besides that the idea of the entity is can return to the Estadi in the closing of the present year, at least with 60% of the available capacity.